The implementation plan for the IUP South Campus VRML Project is: |
| VRML buildings | 1. HTML pages will introduce the project and include textual and graphical
information about the South Campus expansion project.
|
2. We will map out the landscape of the South Campus area in detail
using the VRML elevation grid node. This area includes approximately 554,000
square meters of land.
|
|
3. Using simple geometric shapes, 35 buildings and 12 features such
as ponds, athletic fields and parking lots will be modeled and given appropriate
colors.
|
|
4. The exterior of the President's residence will be modeled in more
detail. The interior will be given special attention, including VRML furnishings,
artwork, etc.
|
|
5. Audio files will be included in the VRML world, such as a doorbell
sound at the front door of the President's residence, bird sounds near
the nature center and ponds, football game sounds near the stadium, etc.
|
|
6. Viewpoints will be created for a walkthrough of the South Campus.
|
|
7. If time permits, more detail will be given to the exterior of other
buildings, such as the Greek Village, and appropriate graphics will be
mapped onto the shapes. Needed graphics will be found on the WWW or created
from photographs taken with a digital camera.
|